Dicko
Wizard
And the result?
Got caught up Wednesday night, Hoping to get it done tonight.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature currently requires accessing the site using the built-in Safari browser.
And the result?
All done, faced the end, drilled and tapped, Installed on the bike and set up PCV settings. The weather today is for squals, rain and thunderstorms, so I will have to wait before I can go for a test ride.
When I screwed it back together, my measurements were bang on - 230mm eye to eye, same as I had before.
Pics below.
I changed the bars on my Fizzer to the Renthal 7/8 ultra lows. Feels great nice relaxed riding position!!
View attachment 23851View attachment 23852View attachment 23853View attachment 23854
Hey guys sorry bout the wait, had to ude the laptop having dramas doing it on the iphone
Looks good
So, it was just a straight swap.?
It would have to be red here or you would be booked for that, could be confusing for other motorist not sure which way your going!
100% agree and red paint is on the next to do list...will have to see if it will work
Took it to work today. Gotta love Texas winter. 62 F when I left this morning, 80 for the ride home today.
That's sweet Eric! Enjoy the ride to work and back. Maybe take the long way???